For Division 8 contractors

Door, frame and hardware takeoff from the schedule out

Momo reads the door schedule and hardware sets, verifies every tag on the plans, counts doors and frames by type, rolls up hardware by set, and builds the priced estimate. Nothing counts until you commit it.

Counts · Lengths
Doors, frames, hardware and storefront
Every line sourced
Door tag, sheet and schedule row on each quantity
$0 until committed
Momo's work stays a proposal until you review it

What does a full Division 8 takeoff in DrawScale include?

A full doors, frames and hardware takeoff in DrawScale reconciles the door schedule with the plans and rolls hardware up by set. Momo reads the door schedule for each door number's size, material, frame type, fire rating and hardware set. It then counts the door tags on the floor plans and reports any tag that appears on one but not the other. Your formulas multiply each hardware set's components by the number of doors assigned to it, giving hinges, locksets, closers, stops and silencers. Storefront and curtain wall are measured as lengths by elevation. Everything carries into the priced estimate with its door number and source sheet.

New to the process? Read the construction takeoff guide or see how Momo runs a full takeoff and estimate.

Sheets Momo reads

  • A-101 to A-104 floor plans
  • A-601 door schedule
  • A-602 door and frame types
  • A-603 door details
  • A-201 to A-202 exterior elevations
  • Section 08 71 00 hardware sets

Typical CSI sections

  • 08 11 13 Hollow Metal Doors and Frames
  • 08 14 16 Flush Wood Doors
  • 08 31 13 Access Doors and Frames
  • 08 41 13 Aluminum-Framed Entrances and Storefronts
  • 08 71 00 Door Hardware
  • 08 80 00 Glazing

The full takeoff

What Momo takes off for door, frame and hardware contractors

Every item is measured on the sheet as a count, a length or an area. Formulas then turn that measurement into the quantities you price. The sheets listed are typical; Momo reports the exact sheets it used for every quantity.

Doors, Frames and Hardware takeoff items, how each is measured, where it is found, and what it produces
Takeoff itemMeasured asTypical sheetsOutputs and formula
Doors by number and typeCountA-101 to A-104, A-601Doors by size, material and rating; plan-to-schedule reconciliation
Frames by typeCountA-601, A-602HM and aluminum frames by profile, gauge and rating
Hardware by setCountA-601, 08 71 00Components per set × doors assigned to the set
Storefront and curtain wallLengthA-201 to A-202, A-104Framing LF and glass SF by elevation
Borrowed lites and sidelitesCountA-101 to A-104, A-602Frames and glazing by type
Access doorsCountA-121 to A-124Access panels by size and rating

Doors and frames

  • Hollow metal doors and frames
  • Flush wood doors
  • Fire-rated openings
  • Borrowed lites and sidelites
  • Access doors

Hardware

  • Hinges and continuous hinges
  • Locksets and exit devices
  • Closers
  • Stops and silencers
  • Thresholds and weatherstripping

Entrances and glazing

  • Aluminum storefront
  • Entrance doors
  • Curtain wall
  • Interior glazing

Every number shows its work

Worked example: Hardware set 04 on Level 1

This is an illustrative example of how a DrawScale quantity is built. Each line shows its formula, and anything that depends on a rate, factor or spacing is marked as an assumption for you to confirm.

Office doors: 3'-0" × 7'-0" solid-core wood in 16 ga HM knock-down frames

A-601 Door Schedule, hardware set 04 in Section 08 71 00, tags counted on A-101

Proposed by Momo · $0 until committed
Worked example for Hardware set 04 on Level 1
LineFormulaResult
Doors assigned to set 04Schedule rows with HW set 04, tags found on A-10138 doors
Hinges38 × 3 per door114 EA
Office locksets38 × 138 EA
Closers38 × 138 EA
Wall stops38 × 138 EA
Silencers38 × 3 per frame114 EA

Meet Momo

How Momo runs a Division 8 takeoff

Schedule first, plans second, and every mismatch reported.

  1. 01

    Reads the door schedule

    Momo reads each door number's size, material, frame, rating and hardware set before counting tags on the plans.

    Schedule-driven counts
  2. 02

    Reconciles plans against the schedule

    Door tags on the plans are matched to schedule rows. Tags found on only one side are reported for you to resolve.

    Mismatches reported
  3. 03

    Rolls up hardware by set

    Each set's components are multiplied by the doors assigned to it, so a change to one set updates every door that uses it.

    Visible roll-up
  4. 04

    Keeps the work reviewable

    Momo's work stays a proposal until you commit it, and every committed door links back to its tag on the plan.

    You commit

What Momo checks for

Where Division 8 takeoffs go wrong

Door takeoffs fail at the seams between the plans, the schedule and the hardware spec.

Tags on the plan that aren't in the schedule

Door 118B shows up on A-101 but not in the schedule. It gets skipped, or priced as a guess.

Hardware sets rolled up by hand

Twenty hardware sets times dozens of doors is a spreadsheet exercise, and one wrong set assignment changes closers, locks and hinges together.

Storefront measured from the wrong view

Storefront length on plan misses the heights on the elevations, so glass and framing come up short.

Fire ratings lost between sheets

A 90-minute label on the schedule changes the door, frame and hardware. If it is missed, the whole opening is priced wrong.

From quantities to a bid

The priced estimate, schedule and export

Committed quantities flow into the estimate worksheet through visible formulas, and every unit rate, waste factor and production rate is labeled as an assumption to confirm. Nothing Momo proposed counts toward a total until you review and commit it.

Bid-stage schedule

The bid-stage schedule groups quantities into activities such as set frames by floor, hang doors, install hardware and storefront. Each duration is installed quantity divided by a labeled production rate you confirm, leveled to your crews, with a critical path and P50 and P80 finish dates.

Coming from another takeoff tool?

If you take off today in Bluebeam Revu, PlanSwift or a spreadsheet, DrawScale opens the same PDF plan sets in the browser with nothing to install. Manual count, linear and area tools always work, and changing a sheet’s scale flags every quantity that depends on it.

What you hand your chief estimator

  • A ledger of committed quantities, each linked to its sheet, scale and traced geometry
  • A priced estimate worksheet with visible formulas and every rate labeled as an assumption to confirm
  • A bid-stage schedule built from installed quantity divided by a labeled production rate
  • An Excel or CSV export with audit columns that contains committed quantities only

Doors, Frames and Hardware takeoff and estimating FAQ

Direct answers for door, frame and hardware contractors.

Yes. Momo reads the door schedule for each door number's size, material, frame type, fire rating and hardware set, then counts the matching tags on the plans.

Hardware is a visible formula: each component in a hardware set times the number of doors assigned to that set. Change a set or a door's assignment and the totals update.

Momo reports it. Tags found on the plans but not in the schedule, and schedule rows with no tag on the plans, are listed for you to resolve before anything is committed.

Yes. Storefront and curtain wall are measured as lengths by elevation, and your formulas derive framing length and glass area from them.

No. Everything Momo produces is a proposal that counts for nothing until you review and commit it.

You get committed quantities linked to door numbers and sheets, a priced estimate worksheet, a bid-stage schedule and an Excel or CSV export with audit columns. The export contains committed quantities only.

Send Momo your next door schedule

Bring a set you have already bid. We will run the full Division 8 takeoff and estimate with you so you can check every opening against numbers you trust.